Public health engineering

Domestic water, drainage, plumbing and utility systems designed around demand, pressure, hygiene, resilience and maintainable distribution.

MM / MEP–03
Project risk

Incomplete demand data and late utility information can lead to undersized connections, oversized storage, unstable pressure and drainage routes that conflict with structure, architecture or external networks.

Required outcome

A coordinated water and drainage strategy with verified demand, pressure and storage criteria, maintainable distribution, resolved utility interfaces and clearly assigned design responsibility at each stage.

Scope of service

Defined outputs, interfaces and stage responsibility.

The final scope is matched to the procurement route, available information and design responsibility. Unconfirmed inputs are held as project risks rather than hidden assumptions.

Scope

  • Incoming-water demand and storage strategy
  • Pressure zoning and boosting
  • Domestic hot-water generation and distribution
  • Above-ground foul and rainwater drainage
  • Water treatment and hygiene interfaces
  • External-utility coordination and connection data

Project stages

  • Utility due diligence
  • Concept demand and zoning
  • Detailed sizing and coordination
  • Tender information
  • Construction and commissioning review

Typical deliverables

  • Demand calculations
  • Storage and booster sizing
  • Domestic hot-water calculations
  • Pipework schematics and layouts
  • Drainage layouts and gradients
  • Plant schedules and utility RFIs

Critical interfaces

The design is controlled at the points where disciplines meet.

01

Civil drainage and external networks

02

Structure and gradients

03

Kitchen, laundry and process equipment

04

Firefighting-water storage

05

Electrical and controls

06

Water quality and operator procedures

Standards and review

Issue only what can be traced and checked.

Applicable Georgian regulations, BS EN 806, BS EN 12056, relevant CIBSE and BSRIA guidance, authority conditions and project-specific water-quality requirements.

Demand units, simultaneous use, water quality, available pressure and authority data are recorded as design inputs. Unknown connection information remains a visible project risk until verified.

InputsDecisionCalculationReviewIssue

Relevant sectors

Applied where the operational brief shapes the engineering.

Appointment questions

Clarify responsibility before work starts.

Can utility capacity be assessed before the final design?

Yes. A feasibility assessment can establish estimated demand, missing authority information, space allowances and connection risks before detailed sizing.

Does the service include external networks?

The boundary is agreed project by project. Above-ground systems, buried networks and authority connections can be coordinated, but civil-design responsibility must be stated.

How is domestic hot-water demand controlled?

Occupancy, use profile, peak duration, storage, recovery, circulation and temperature criteria are documented before plant and distribution are sized.

Project enquiry

Define the public health engineering appointment.

Share the project location, stage, available information, required deliverables and decision date. We will identify the correct scope and the information needed to proceed.

Privacy controls