> Technical reviews and design audits | Milli MEP

MEP–05 · Service

Technical reviews and design audits

Independent review of design assumptions, calculations, drawings, specifications, compliance and buildability before project commitment.

MM / MEP–05
Project risk

Tender or construction information may appear complete while concealing unsupported loads, unresolved interfaces, missing responsibilities and untested procurement assumptions.

Required outcome

A prioritised, evidence-based review of technical exposure, with actions linked to responsibility, project stage and defined acceptance criteria.

Scope of service

Defined outputs, interfaces and stage responsibility.

The final scope is matched to the procurement route, available information and design responsibility. Unconfirmed inputs are held as project risks rather than hidden assumptions.

Scope

  • Design-basis and criteria review
  • Calculation and capacity checks
  • Drawing and specification audit
  • Spatial and buildability review
  • Value-engineering technical assessment
  • Condition survey and due-diligence input

Project stages

  • Acquisition or investment review
  • Concept gateway
  • Pre-tender assurance
  • Contractor-design review
  • Pre-commissioning or handover review

Typical deliverables

  • Independent review report
  • Risk-ranked observations
  • Calculation spot checks
  • Design-compliance matrix
  • Coordination mark-ups
  • Decision, action and close-out register

Critical interfaces

The design is controlled at the points where disciplines meet.

01

Appointment and responsibility

02

Client brief and employer’s requirements

03

Authority comments

04

Contractor-design portions

05

Equipment substitutions

06

Commissioning evidence

Standards and review

Issue only what can be traced and checked.

The agreed review basis identifies the applicable Georgian requirements, project standards, relevant CIBSE, BS, BS EN, BSRIA, ASHRAE or NFPA references and any reliance limitations.

The review level, sample basis, available information and reliance limits are agreed before work starts. A peer review does not transfer the original designer’s responsibility unless the appointment expressly changes it.

InputsDecisionCalculationReviewIssue

Relevant sectors

Applied where the operational brief shapes the engineering.

Appointment questions

Clarify responsibility before work starts.

Is an independent review the same as redesign?

No. A review identifies and tests risk against an agreed basis. Redesign is a separate scope with its own inputs, coordination duties and design responsibility.

Can the review be completed before tender?

Yes. Pre-tender review is often the most commercially useful point because gaps can be resolved before pricing and procurement assumptions harden.

What determines the depth of a design audit?

The project stage, consequence of failure, available evidence, sample size, programme and intended reliance are fixed before review begins.