> MEP Engineering Insights | Milli MEP

Insights

Technical questions that improve the commercial decision.

Milli MEP publishes focused engineering commentary for developers, designers, contractors and operators. Each article states its author, status, review date and project-specific limitations.

MM / KNOWLEDGE REGISTER

Current technical briefs

Resolve the risk before it becomes a variation.

The publication set focuses on decisions that shape space, capacity, responsibility, life safety and operational performance.

INS-01

DESIGN RESPONSIBILITY · 8 MIN READ

What a Basis of Design report should—and should not—promise

A Basis of Design is a decision record. If it only lists standards and describes systems, it does not control the design. Read technical brief
INS-02

INDUSTRIAL HVAC · 8 MIN READ

Separate comfort loads from process ventilation

A production hall is not an office with a higher air-change rate. Process release, source capture, contamination, fire risk and continuity govern the ventilation strategy. Read technical brief
INS-03

PLANT SPACE · 8 MIN READ

Reading a plant-room drawing: what coordinated means in practice

Plant space is the physical consequence of capacity, resilience, access, distribution and replacement decisions—not an allowance to be filled later. Read technical brief
INS-04

STANDARDS · 8 MIN READ

Reconciling CIBSE and ASHRAE guidance with Georgian regulations

International guidance can strengthen a design, but it does not displace local law or remove the need for a declared project hierarchy. Read technical brief
INS-05

LIFE SAFETY · 8 MIN READ

Smoke-control principles architects should resolve before fixing the ceiling zone

Smoke control depends on flow paths, reservoir geometry, replacement air and protected power; it cannot be added after the principal spaces are fixed. Read technical brief
INS-06

UTILITIES · 8 MIN READ

Why utility-capacity planning must happen before concept design

A concept cannot be commercially reliable until the project team knows what the site can receive, reject and accommodate. Read technical brief

Publication plan

Focused topic clusters, not search-volume filler.

Utility-capacity planningSmoke-control design briefsDomestic hot-water strategyOverheating and thermal comfortMEP design responsibilityCommissioning and handoverTechnical due diligenceCommon tender-design failures

Project enquiry

Have a technical question tied to a live project decision?

Share the context and the decision deadline. General content can frame the issue; a formal appointment is required before project-specific engineering advice is given.

Privacy controls